HUAWEI BTS3900L PDF

Indoor model: BTS, BTSL. − Outdoor model: BTSA. ○ Distributed base station: DBS BTS BTS, the indoor macro base station. Huawei series LTE FDD base stations can be classified into indoor macro base stations (BTS and BTSL), outdoor macro base stations. Manuals and User Guides for Huawei BTSL GSM. We have 1 Huawei BTSL GSM manual available for free PDF download: Installation Manual.

Author: Daramar Moogushakar
Country: Angola
Language: English (Spanish)
Genre: Relationship
Published (Last): 21 April 2018
Pages: 199
PDF File Size: 14.60 Mb
ePub File Size: 16.7 Mb
ISBN: 133-7-64301-274-9
Downloads: 25816
Price: Free* [*Free Regsitration Required]
Uploader: Tojalkree

The customer’s technical engineers must be trained by Huawei and be familiar with the proper installation and operation methods. Privacy Terms of use.

Huawei BTS3900L GSM Manuals

Before a cabinet is installed, you must familiar with the cabinet structure, application scenario, and space requirements. If DC power cables need to be routed on the tower platform, lay out the cables on the guardrail with the shortest distance and route the cables along the guardrail.

Page 33 Check whether the power cables are securely connected, and the screws are tightened on the cables in the cabinet by referring to Figure Table Page 40 Align the spring pin with the hole, rotate the pin to the right until it is tightly pressed by the door. Installing The Gatm And Bias-tee C Hardware Description — Safety Information During the installation, you must familiar with the following reference document: Figure shows correct and incorrect operations.

Related Articles  INICIJACIJA ELISABETH HAICH PDF

Page CPRI fiber optic cables are routed out of the cabinet through the nearer left or right cable outlet.

Page 43 M12x60 bolts huaeei secure the base, as shown in Figure Step 5 Use a level to check the cabinet level, as shown in Figure Powering On The Btsl Small cell base station.

Page 73 Cable clips must be vertical with cables, and the cables in a cable clip must be parallel.

Indoor Macro Base Station BTS3900

Before huaweo any operation, onsite personnel must be familiar with correct operation methods and safety precautions. Page 42 Installation Guide 8 Installing the Cabinet Context When installing a BTSL on a base, use a marking template matching the base to determine the positions of the holes for installing the cabinet.

CPRI fiber optic cables are routed out of the cabinet through the nearer left or right cable outlet. Page 79 Locate the cables around the binding bracket according to the figures showing the spatial positions of the cables.

Figure shows the installation procedure. Compared with issue 06no topic is added. Product Versions The following table lists the product versions related to this document. Page 39 If the resistance is greater than or equal to five megohms, you can infer that the cabinet is insulated from the floor.

Related Articles  ISBN 9780761556992 PDF

Sufficient slack recommended for about 0. Installing The Power Cables In the case of full configuration with 12 RFUs, connect the huaweu power bbts3900l and supply the power to the cabinet.

Huawei BTSL GSM Manuals

C Installation Guide 06 This is the sixth official release. The cabinet door can be removed before the cabinet is installed for easy operations. Btsl gsmBtsl lteBtsl wcdma. Small Configuration Scenario I: One cable outlet allows a maximum of 12 CPRI fiber optic cables. Align the spring pin with the hole, rotate the pin to the right until it is tightly pressed by the door.

Installing The Bts3900p Page 49 M12x60 bolts to secure the base, as shown in Figure The cables are neatly and tightly bound. Drag Press and hold the primary mouse button and move the pointer to a certain position. Installing The Bbu Case Step 1 Align mounting holes on the cable holders with mounting holes on both sides of the BBU case, and then use two M4 screws on each side to secure the cable holes to 1.